Flexible Electronics News

Swift Current Energy Places 500 MW Order with First Solar

Order for Series 7 modules, to be delivered between 2027 and 2028, builds on existing 3.3 GW relationship.

Author Image

By: DAVID SAVASTANO

Editor, Ink World Magazine

First Solar, Inc. announced an agreement to supply Swift Current Energy with 500 megawatts (MW) of advanced Series 7 thin film modules. Swift Current Energy, a Boston-headquartered developer, owner, and operator of utility-scale clean energy assets, has previously placed orders for 3.3 gigawatts of First Solar modules in 2022. This latest order, which was booked prior to the release of First Solar’s Q3 2023 results on Oct. 31, 2023, will see modules delivered between 2027 and 2028. Swift C...

Continue reading this story and get 24/7 access to Ink World magazine for FREE


Already a subscriber? Sign in

Keep Up With Our Content. Subscribe To Ink World magazine Newsletters